Riyadh Water Tower




Riyadh Water Tower
Scope of Works:
•Replacement of the existing 70meters DN600 stainless steel vertical pipelines inside Riyadh Tower, and insertion of the      DN600 Butterfly Valves and stainless steel Dismantling Joints.
• Replacement of the buried DN800 Ductile iron main feeding line connected to the DN600 vertical pipes.
• Replacement and upgrading the valve chamber.