Connection of line CF-6 with line MZ-TGC Station




Connection of line CF-6 with line MZ-TGC Station
Scope of Works:
• Supply and install 300 meters DN800 – DN1200 of Ameron pipe.
• Supply and install 2 DN800 Pressure Reducing Valve, and connect to the existing SCADA system.
• Supply and install of different Valves, size from DN300 until DN1200.
• Install Cathodic Protection System.
• Construction of 6 different Valve Chambers.